Answer: With Net metering facility, grid tied systems are installed. That means when there is more power than your usage, you sell power to grid so during the power cut you will not have power unless you also buy back up system.
Post date: Oct 10 2017 - 10:35
Answer: It depends on following factors: 1. Size of the system 2. Feed in tariff in your state 3. Your household consumption
Post date: Oct 10 2017 - 10:17
Answer: It generally involves cleaning of the solar panels once every six months. Apart from this you need to maintain acid levels in the battery as per specification.
Post date: Oct 10 2017 - 10:13
Answer: Generally 1kW of solar system takes upto 75 sq feet of roof space. Apart from this, some space is also required for battery and inverter.
Post date: Oct 10 2017 - 10:03
Answer: » There is need grid interactive solar PCU . It is available more than 5 Kw Inverter. Its work on frequency. Firstly prefer solar frequency and if not available than mains or combine one. So we could provide you exact solution as per your requirement which is customize.
Post date: Apr 30 2017 - 15:33
Answer: » The dg set operation should always be on mini 50pc load or more. The consumption is almost same . please take load capacity into acount while designing solar system. Should work with grid tie with smaller capacity dg set or hybrid with control. - Subodh 23-May-2013 » I wonbt be able to explain all the details, but no a 20Kw system wouldn't essentially replace 20% of the load. the system size to replace 20Kw of system load would be around 27-30 Kw depending on the site conditions and loads. Similarly load patterns and types of load also determine this. typically lighting and fan loads can be replaced. Similarly the efficiency of the DG set also gets reduced if the DG is not working at full load. Give me a call sometime in the evening around 7pm if you want more information on the same.